cover
Contact Name
Anri Noor Annisa Ramadan
Contact Email
jitsi@unper.ac.id
Phone
+6285624522817
Journal Mail Official
jitsi@unper.ac.id
Editorial Address
Jalan PETA No. 177 Kota Tasikmalaya, Kode Pos 46115
Location
Kota tasikmalaya,
Jawa barat
INDONESIA
JITSi : Jurnal Ilmiah Teknik Sipil
ISSN : -     EISSN : 27467597     DOI : https://doi.org/10.36423/jitsi.v2i2
Core Subject : Engineering,
JITSi: Jurnal Ilmiah Teknik Sipil is a Civil Engineering Scientific Journal that aims to take part in the development of sustainable infrastructure, as well as the dissemination of conceptual ideas and the implementation of preventive measures, especially development in the tropics, which are prone to disasters. In particular, we seek to publish research that has the potential to contribute in the real world to improving community and local countries preparedness and responsiveness to natural disasters. This includes research, technical notes, policy articles, and editorials from the following areas of civil engineering Structural Engineering and Construction Materials, Geotechnical Engineering, Water Resources Engineering, Transportation Engineering, Construction Engineering Management and General Infrastructure.
Articles 6 Documents
Search results for , issue "Vol. 1 No. 1 (2020): DESEMBER 2020" : 6 Documents clear
ANALISIS STRUKTUR TAHAN GEMPA HOTEL SANTIKA TASIKMALAYA DENGAN METODE ANALISIS STATIK DAN DINAMIK TIME HISTORY Rani Anggraeni
JITSi : Jurnal Ilmiah Teknik Sipil Vol. 1 No. 1 (2020): DESEMBER 2020
Publisher : Universitas Perjuangan Tasikmalaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (537.996 KB) | DOI: 10.36423/jitsi.v1i1.460

Abstract

Indonesia merupakan negara rawan terjadi gempa. Gempa yang terjadi telah membuktikan masih banyak bangunan gedung yang mengalami kerusakan  ringan hingga berat bahkan sampai runtuh. Diterapkannya SNI 1726-2012 sebagai standar yang baru telah menambah dan mengubah ruang lingkup tata cara perhitungan gempa menjadi lebih luas sehingga dapat mengikuti perkembangan zaman yang ada. Penelitian ini bertujuan untuk mengetahui keamanan gedung dilihat dari displacement, drift dan base shear Yang digunakan adalah analisis statik ekivalen dan dinamik time history dengan program ETABS V.13. Rekaman gempa yang digunakan antara lain gempa Elcentro,  gempa Tabas dan gempa Loma. Hasil penelitian menunjukan bahwa nilai displacement, drift dan base shear analisis  statik ekivalen mengeluarkan nilai yang lebih kecil dan gaya dalam  elemen struktur berada pada kondisi aman serta memenuhi syarat. Jika dilihat dan dianalisis dengan metode dinamik time historydengan beban gempa Elcentro, Tabas dan Loma menunjukan bahwa,jika dilihat dari simpangan antar lantai memenuhi syarat, namun dengan gaya dalam berada pada kondisi tidak aman. Serta secara umum peninjauan pada momen kolom dan balok antara beban gempa statik dan dinamik dapat disimpulkan bahwa momen analisis dinamik berada pada kondisi tidak aman. Sehingga Jika terjadi gempa setara dengan gempa Elcentro, Tabas dan Loma ada kemungkinan struktur akan mengalami kerusakan.Kata kunci: Analisis statik, analisis dinamik time history, ETABS 2013
PERENCANAAN STRUKTUR ATAS ( PELAT, BALOK, KOLOM ) GEDUNG RAWAT INAP RSUD MITRA BATIK KOTA TASIKMALAYA Hari Ramdhani
JITSi : Jurnal Ilmiah Teknik Sipil Vol. 1 No. 1 (2020): DESEMBER 2020
Publisher : Universitas Perjuangan Tasikmalaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (785.027 KB) | DOI: 10.36423/jitsi.v1i1.467

Abstract

Abstrak— Gedung Rumah sakit ini rawat inap RSUD mitra batik merupakan bangunan gedung bertingkat yang dirancang dan dibangun untuk dapat menampung segala aktifitas yang berkaitan dengan masalah kesehatan masyarakat khususnya dikota Tasikmalaya. Metode yang digunakan yaitu membandingkan perhitungan manual dan perhitungan menggunakan software ETABS. Berdasarkan hasil perhitungan, metode perhitungan menggunakan software ETABS lebih banyak menghasilkan tulangan dibandingkan perhitungan secara manual, untuk struktur pelat lantai secara manual di dapatkan ketebalan 120mm, menggunakan 12-300mm, Untuk struktur balok terdapat 4 tipe dengan dimensi terbesar (250x500) mm, menggunakan tulangan pokok 6D16, tulangan geser tumpuan 10-195 mm dan tulangan geser lapangan 10-200 mm, Untuk struktur kolom terdapat 2 tipe dengan dimensi terbesar (500 x 500) mm, menggunakan tulangan pokok 10D16, tulangan geser 12-250 mm, untuk perhitungan hasil software ETABS struktur balok (250x500) mm menggunakan tulangan pokok 8D16, tulangan geser tumpuan 10-195 mm dan tulangan geser lapangan  10-200 mm, untuk kolom (500x500)mm menggunakan tulangan 13D16 dengan tulangan geser 12-250 mm..Kata kunci —  SNI 03-2847-2013, ETABS, Analisis Struktur
EVALUASI SISTEM PROTEKSI KEBAKARAN PADA BANGUNAN GEDUNG HOTEL BERTINGKAT Putri Noor Qadhariyah Fitriyanti
JITSi : Jurnal Ilmiah Teknik Sipil Vol. 1 No. 1 (2020): DESEMBER 2020
Publisher : Universitas Perjuangan Tasikmalaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (507.055 KB) | DOI: 10.36423/jitsi.v1i1.474

Abstract

Pembangunan di Kota Tasikmalaya semakin menigkat, pembangunan gedung yang beragam dan kompleks menuntut aspek keselamatan dan rasa aman terhadap bangunan gedung dan lingkungannya. Salah satu aspek keselamatan yang penting dari sebuah bangunan gedung adalah keselamatan dari bahaya kebakaran. Tujuan penelitian ini adalah untuk mengidentifikasi penerapan sistem proteksi aktif dan sarana penyelamatan di Hotel Santika Tasikmalaya, dan juga untuk menganalisa tingkat keandalan sistem keselamatan bangunan terhadap bahaya kebakaran berdasarkan peraturan PERMEN PU No.26/PRT/M/2008. Metode yang digunakan dalam penelitian ini berupa metode deskriptif - kualitatif dan deskriptif - kuantitatif. Hasil dari penelitian ini, pada penerapan sarana penyelamatan menghasilkan nilai skala likert 21,28 dengan hasil persentase 85,12%  dan sistem proteksi aktif menghasilkan nilai skala likert 22,62 dengan hasil persentase 94,25%. Hal ini menunjukan sistem proteksi di Hotel Santika Tasikmalaya sesuai dengan peraturan PERMEN PU No.26/PRT/M/2008. Untuk perhitungan Nilai Keandalan Sistem Keselamatan Bangunan (NKSKB) menghasilkan nilai 92,25% yang berarti nilai kondisi keandalan bangunan BAIK. Kata Kunci : Hotel, Proteksi Kebakaran, Keandalan Bangunan
ANALISIS PENGENDALIAN WAKTU PROYEK KONTRUKSI MENGGUNAKAN EARNED VALUE CONCEPT (EVC) DAN CRITICAL PATH METHOD (CPM) (Studi Kasus : Lanjutan Pembangunan Jalan Ruas Jalan Ciawi Singaparna Kabupaten Tasikmalaya) Sehabul Milah
JITSi : Jurnal Ilmiah Teknik Sipil Vol. 1 No. 1 (2020): DESEMBER 2020
Publisher : Universitas Perjuangan Tasikmalaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (557.141 KB) | DOI: 10.36423/jitsi.v1i1.478

Abstract

Abstract— The success of a project is not separated from a series of covering  activities the stages of planning, implementation and supervision. In time control of a project is indispensable for a project to be able to complete the project on time or earlier than planned. The method of time control used in this research is the method of Earned value concept and Critical Path method (CPM) .This Research was conducted on the advanced project of  Lanjutan Pembangunan Jalan Ruas Jalan Ciawi Singaparna Kabupaten Tasikmalaya District which aims to know the project performance and completion time of work on the construction project of the building. The data used in this study are Time Schedule, cost budget plan, and weekly progress financial statement. From analyst data, the result can be found that in the values of BCWP and BCWS after they are obtained by the SV, SPI, and predicting the project end time completion (ETS and EAS) and generating critical paths and float calculations. From the results of the analysis of the time of completion in Week 12 reporting advanced Project of Lanjutan Pembangunan Jalan Ruas Jalan Ciawi Singaparna Kabupaten Tasikmalaya District experienced a delay of 3 weeks from 21 weeks to 24 weeks but the results of the delay CPM analysis occurred outside the critical path so there are still opportunities to complete the project on time or faster of the plan.Keywords — Earned value method (EVC), Critical Path Method (CPM), BCWP, BCWS, SV, SPI, ETS, EAS.Abstrak— Keberhasilan suatu proyek tidak lepas dari serangkaian aktivitas yang meliputi tahapan perencanaan, pelaksanaan dan pengawasan. Dalam Pengendalian waktu pada suatu proyek diperlukan agar suatu proyek mampu menyelesaikan proyek dengan tepat waktu atau lebih awal dari yang direncanakan. Metode pengendalian waktu yang digunakan pada penelitian ini adalah metode konsep nilai hasil (Earned Value Concept) dan Critical Path Method (CPM). Penelitian ini dilakukan pada Proyek Lanjutan Pembangunan Jalan Ruas Jalan Ciawi Singaparna Kabupaten Tasikmalaya yang bertujuan untuk mengetahui kinerja proyek dan waktu penyelesaian pekerjaan pada proyek pembangunan gedung tersebut. Data-data yang digunakan dalam penelitian kali ini meliputi Time Schedule, Rencana Anggaran Biaya, dan laporan progress mingguan. Dari data tersebut dapat menghasilkan nilai BCWP dan BCWS setelah itu didapatkan nilai SV, SPI, serta memprediksi penyelesaian waktu akhir proyek (ETS dan EAS) dan menghasilkan jalur kritis dan perhitungan float. Dari hasil analisis terhadap waktu penyelesaian pada minggu ke 12 pelaporan Proyek Lanjutan Pembangunan Jalan Ruas Jalan Ciawi Singaparna Kabupaten Tasikmalaya mengalami keterlambatan 3 minggu dari 21 minggu menjadi 24 minggu namun hasil analisis CPM keterlambatan yang terjadi diluar jalur kritis jadi masih ada kesempatan untuk menyelesaikan proyek tepat waktu atau lebih awal dari rencana.Kata kunci —  Earned Value Method (EVC), Critical Path Method (CPM), BCWP, BCWS, SV, SPI, ETS, EAS.
ANALISA PENENTUAN DEBIT ANDAL DENGAN METODE HYDROLOGISKA BYRANS VATTENBALANSAVDELNING DI BENDUNG PATARUMAN Nur Arsy Erlinna Amallia
JITSi : Jurnal Ilmiah Teknik Sipil Vol. 1 No. 1 (2020): DESEMBER 2020
Publisher : Universitas Perjuangan Tasikmalaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (603.323 KB) | DOI: 10.36423/jitsi.v1i1.490

Abstract

Simulasi model hidrologi telah dikembangkan diberbagai negara, yang pada dasarnya dirancang untuk menyederhanakan sistem hidrologi dengan parameter input data yang lebih sederhana, mudah diukur dan cepat diperoleh hasil keluaranya. Model hidrologi yang sering digunakan di Indonesia yaitu metode NRECA dan FJ. Mock, selain dari itu ada model hidrologi yang bisa digunakan salah satunya yaitu metode HBV.Penggunaan metode hidrologi HBV kebanyakan digunakan didaerah subtropis, sehingga pada daerah tropis ini merupakan uji keterbaruan terhadap model hidrologi. Metode HBV mempunyai konsep model hidrologi yang sederhana, dan softwarenya pun memiliki tampilan yang mudah dipahami juga mudah digunakan pada PC sistem komputer. Pada penelitian ini akan dikaji mengenai kesesuaian model hidrologi HBV, kemudian dihubungkan dengan ketersediaan air yang merupakan debit andal. Uji kesesuaian model dilakukan pada Bendung Pataruman. Tujuan dilaksanakannya penelitian ini untuk menganalisis besarnya debit andal Bendung Pataruman, dan menganalisis kesesuaian model HBV dengan debit pengamatan di Bendung Pataruman menggunakan parameter effisiensi model dan NSE.Hasil simulasi menunjukan rata-rata nilai effisiensi model sekitar 0.5295 artinya >0.51 model bisa digunakan, sedangkan  besarnya rata-rata nilai NSE sekitar 0.8816 maka model tersebut dikategorikan sangat baik. Besarnya nilai rata-rata debit andal 80% di Bendung Pataruman berdasarkan observasi adalah 3.049 m3/s sedangkan berdasarkan hasil simulasi sebesar 1.899 m3/s.
KETERSEDIAAN KETERSEDIAAN FASILITAS PADA PERUMAHAN SUBSIDI DI KOTA TASIKMALAYA Karisma Sari Aprilia
JITSi : Jurnal Ilmiah Teknik Sipil Vol. 1 No. 1 (2020): DESEMBER 2020
Publisher : Universitas Perjuangan Tasikmalaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (293.847 KB) | DOI: 10.36423/jitsi.v1i1.548

Abstract

Abstrak— Perumahan merupakan salah satu kebutuhan pokok masyarakat terutama perumahan bersubsidi maka dari itu banyak pengembang yang menawarkan perumahan, akan tetapi tidak sedikit perumahan yang tidak sesuai dengan peraturan yang pemerintah buat, salah satunya adalah permasalahan fasilitas yang belum terpenuhi. Tujuan penelitian ini untuk mengetahui fasilitas yang belum tersedia maka dilakukan perbandingan dengan ketentuan pemerintah dengan mendata langsung ke setiap perumahan yaitu Perumahan Baitussalam Regency, perumahan Bumi Mutiara Mandiri dan perumahan Villa Bukit Sakura, dan juga membandingkan dengan peraturan pemerintah pada SNI 03-6981-2004. Metode yang digunakan dalam penelitian ini merupakan mendata langsung ke setiap perumahan dan menggunakan SNI sebagai acuan. Hasil dari penelitian ini, pada ketersediaan fasilitas pada Perumahan Baitussalam Regency adalah fasilitas niaga, fasilitas pemerintah dan pelayanan umum. Perumahan Bumi Mutiara Mandiri fasilitas niaga, fasilitas pemerintah dan pelayanan umum, fasilitas ruang terbuka hijau, dan fasilitas peribadatan. Perumahan Villa Bukit Sakura fasiltas niaga, fasilitas pemerintah dan pelayanan umum, fasilitas ruang terbuka hijau dan fasilitas peribadatan. Untuk kesesuaian penataan tata letak fasilitas ׃ Perumahan Bumi Mutiara Mandiri yang berbeda ada pada nilai KDH yaitu 10 %, dan untu perumahan Villa Bukit Sakura yang berbeda pada KDH yaitu 12 % dari ketentuan yang seharusnya paling kecil 15%. Kata kunci — Fasilitas Perumahan Bersubsidi, KDB, KLB, dan KDH.

Page 1 of 1 | Total Record : 6